CURRENT projects

KARABURMA

 

In Karaburma, on the very border with Mirijevo settlement, nearby Mirijevski bulevar, the first construction phase of residential-business facility began (residential building A). Currently, two out of 6 planned building are being built.


The buildings 5 and 6 consist of 95 flats, 22 garage and 83 parking spaces. All the flats are designed to be provided with energy passports and each building is going to have two elevators. The whole project is financially supported with Banca Intesa and Societe General Bank of Serbia.

 

The residential block is located near Mirijevski bulevar. In spite of heavy traffic, this part is protected from traffic jam and connected to other city areas, 6km from the very center of Belgrade (Terazije), 2 km far away from Bulevar Kralja Aleksandra and only 1.5km from Visnjicka street.

 

There are various schools and other important buildings in the immediate vicinity - VII Belgrade Grammar school and elementary school Filip Višnjić, a nursery school, shopping mall Karaburma (http://www.sck.rs/), Ada Huja and Zvezdara forest (sports-recreational activities). Another shopping mall, Visnjicka Plaza, is to be built in the coming period (http://www.visnjickaplaza.rs/).

 

 

 

 

IZABERITE LAMELU

 

Lamela 5 - KARABURMA

Lamela 6 KARABURMA